A) Please have the majority of your paint colors picked out. This will allow us to get right to work without any delays. The paint sheen to be used (flat, eggshell, satin, or semi-gloss) are also important. We will likely have already discussed the sheen to be used depending on the areas to be painted. If not, please contact me for final recommendations. We will call to confirm colors and sheen before ordering any paint.
B) We will move furniture at least three feet out from the walls and put it back. Don't worry, we will thoroughly cover anything which may be in the work area. Although we take great care if we need to move any furniture, please let us know if you have a particularly delicate piece (such as an antique) before work begins.
C) Have all small or breakable items (lamps, picture frames, figurines, etc.) moved off of tables, mantles, window sills, or counters in the work area.
D) Please remove all objects (pictures, mirrors, hanging shelves, etc.) which are mounted on the walls. If an object is to go back in the same place after the work is completed, simply leave the nail or other hanging device where it is and we will deal with it. If you do not wish to return an object to the same place, remove the nail or hanging device and we will fill the hole(s) before the painting begins.
E) We will take down any window treatments such as curtains, valances, and panels. Curtain rods should also be removed but the wall brackets that support them can remain. Blinds and shades mounted inside the window frame can stay where they are.
F) In bathrooms, please clean the outside of the toilet, the surrounding lower walls and sides of cabinets, and the floor area around the toilet. In kitchens, please clean the areas behind the refrigerator and (if applicable) the stove.
Things you don't need to take care of before the painting begins:
A) Leave outlet and switch plate covers in place. Our bids include their removal, cleaning, and replacing.
B) Covering the wall or ceiling light fixtures. We will deal with these. An exception may be if you are planning to get any new fixtures. Please let us know if this is the case.
C) Ordering and getting the paint to the job site. Unless other arrangements have been made, this will be done by us.
*It is our goal to make the painting process be as stress-free as possible for our clients. Please don't hesitate to contact us if you have any questions or concerns after reading this material or any time prior to the start of the job.
A) Cut back all bushes that are touching the house.
B) Remove and store all items from your front and back porch (if applicable) that you would not want to get wet during the pressure washing.
C) Make sure all windows are closed prior to our arrival for pressure washing.
D) Please make arrangements to contain or remove your pets during the project.
E) Please turn off automatic sprinkler systems and alarm systems for the duration of the project.
F) Please understand that we cannot control the weather and that the duration of the project can change for one week or two.
G) Please have your paint colors picked out. This will allow us to get right to work without any delays. The paint sheen that is to be used, flat or satin, is also important. We will likely have already discussed with you over the sheen to be used. If not, please contact us for final recommendations. We will call to confirm colors and sheen before ordering and paint.
H) Do not stress. You have hired professionals who do this every day. We understand the disruption caused by having work done on your home and we will do everything possible to make it as easy for you as we can.
*If you are unable to complete any items on the checklist, please contact us and we will be happy to make arrangements with you. MES Painting takes pride in our professionalism and craftsmanship. Time is taken to prepare and protect your property as if it were our own and to provide the best possible service to complete your project in an efficient and timely manner.
Copyright © 2024 MES Painting - All Rights Reserved.
Licensed & Insured PB U-20684, MCPTG4725, MCNS6132, SL26364, CPSL10401, IR16938
Powered by GoDaddy